1) Is it possible to run an elevator (of capacity 450 kg) with a solar+battery backup (assuming solar module capacity is 4-4.5 kW) instead of a DG set? If yes, will it economical?
2) Is it possible to install this 4-4.5 kW solar module with both battery backup and grid-tied (net-metering) and still avail govt. (whether NREDCAP’s or MNRE’s) subsidies?